An outlaw’s diary: the Commune
Cécile Tormay

THE CLASSIC COLLECTION · 1848
"Account of the Skerryvore Lighthouse" by Alan Stevenson is a historical account written in the mid-19th century. The book details the construction and illumination of the Skerryvore Lighthouse, highlighting the complexities involved in erecting the structure on a treacherous rocky outcrop amidst severe Atlantic conditions. At the start of the volume, the author provides a prelude that underscores the challenges faced during the project, such as the urgency of building the lighthouse to ensure safety for mariners and the risks associated with the physical environment. The discussion includes acknowledgments of his predecessors and the context of the Lighthouse Board's establishment, emphasizing its critical role in enhancing maritime safety. Stevenson articulates the necessity of careful planning and the difficulties encountered during the initial surveys of the rock, setting the stage for a detailed exploration of both the engineering accomplishments and the technical innovations introduced in lighthouse illumination.
Introduction adapted from the source catalogue; source summaries may be automatically generated.
Free to read · English · 146,624 words · No account needed
MAKE TIME FOR A GOOD BOOK
On by default. Untick to stop anonymous reading totals. Each page counts after 10 seconds in view. How this works.
Anonymous counting is on unless you have switched it off.
PRELIMINARY ARRANGEMENTS AND WORKS, INCLUDING SURVEY OF THE ROCKS, AND OPENING OF QUARRIES, FROM 1834 to 1837.
~Survey of the Skerryvore Rocks.~
In this chapter I shall very briefly notice those preliminary arrangements which may be said to have been in a great measure preparatory to the commencement of the work itself. It has been already stated, that the erection of the Lighthouse was provided for in the Act of 1814; but so formidable did this work appear, that although it was repeatedly under consideration, it was not until the General Meeting of the Board, on the 8th July 1834, that any measures were taken to carry into effect the provisions of the Act. On that occasion it was moved by the late Mr MACONOCHIE, Sheriff of Orkney and Zetland, that the Engineer should be instructed to make the necessary survey, and to report as to the expense of erecting the Lighthouse. In terms of this remit, the survey of the Rocks was commenced in the autumn of 1834; but from the broken state of the weather, little was effected at that time beyond making the triangulation; and it was not until the summer of 1835 that the survey was completed from which the Chart, Plate No. II. was constructed. This survey was attended with much more labour than its extent would lead one to suppose, in consequence of its embracing the entire range of operations required in a more extensive nautical survey, and combining with the ordinary details required for a Chart, the minute accuracy in regard to surface and levels, which are always necessary for the purposes of the Engineer.
The first step was the measurement of a base line in the low lands of the adjoining Island of Tyree, which, owing to the distance and disadvantageous position of that island, could not be satisfactorily extended to the Rock without fixing stations in some of the more distant islands; and in the course of the work not fewer than twenty land triangles were measured. The calculations of the distances founded on this triangulation agreed with those afterwards obtained from the data of the Trigonometrical Survey, which were kindly furnished to me by Captain Yolland of the Royal Engineers, in 1843. For the purpose of making the soundings and laying down the sunken rocks, an entirely separate triangulation, based upon and connected with that which has already been noticed, became necessary, as the land objects were too distant, and their relative positions were such as to render it difficult by observations from them alone to determine any stations on the sea. Buoys were therefore moored at convenient points, and their positions determined by a subsidiary triangulation, so as to form a net-work of triangles between the shore and the Skerryvore Rock. The distances between these buoys were afterwards used as the bases of imaginary triangles, having points of sounding or shoals in their apex; and the angles subtended by those distances being measured by the sextant, the positions of the shoals or soundings were thence easily deduced and protracted on the Chart.[4] In connection also with the soundings whose positions were determined in the way above described, a complete set of tide observations was made, extending over a period of about six weeks. Those tide observations were connected in point of time, with the soundings, and were employed as the means of correcting the observed depths taken with the sounding-line, so as to give the true depth in reference to the high or low water of a given tide. Accurate measurements, and minute sections, were also made of the rocks in reference to the tide-level, and more especially of the main rock, on which alone it was obvious, from the first inspection, that the Lighthouse Tower could be erected. In the course of this survey, the positions of upwards of 140 rocks were determined, and laid down on the Chart, and 500 soundings were taken, and their positions protracted. An interesting fact was also noticed regarding the mean level of all the tides which had been watched during the period of about six weeks, as above noticed, viz., that the point half way between the high and low water of every tide is on one and the same level. This fact regarding the tides was, it is believed, first detected by my Father, in the course of some tidal observations which he made in the Dornoch Frith in 1830, and has since been observed in the Frith of Forth in 1833, and again on the shores of the Isle of Man, and at Liverpool. The agreement of so many observations by various persons at places on the opposite shores of the Kingdom, seems to imply the universality of this phenomenon in the British Seas; and the position of Skerryvore would lead to the belief, that it is not confined to narrow seas, but that it exists in the ocean. I cannot dismiss the subject of the survey, without mentioning the late Mr James Ritson, who acted as principal assistant surveyor, and to whose zeal and intelligence so much of its accuracy is to be attributed. The deep gulley which intersects the main Rock from N.E. to S.W., and across which he one day sprang while it was filled with a breaking wave, bears his name, as a memorial of his activity and perseverance. At the close of the survey in 1835, the station-pole was left wedged and batted into one of the fissures or crevices of the Rock, and a cask of water was firmly lashed to ring-bolts in a cleft of the highest part of the Rock, in the hope that it might possibly prove useful to some shipwrecked seamen.
Your reading position is saved on this browser. Take it to another device with a library code. Reading pages adapt to text, rather than matching a printed edition.
BEHIND THE BOOK
This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Read the source licence.
The original source file, including credits and licence, is retained by this library. Request an original-format copy at no charge. Please include the book title and Project Gutenberg identifier #75213.
KEEP YOUR CURIOSITY GOING
Cécile Tormay

Moritz Busch
John L. Ransom
Frances Wright
Cécile Tormay

Mabel Potter Daggett