The Writing of News A Handbook with Chapters on Newspaper Correspondence and Copy Reading
Charles G. (Charles Griffith) Ross

THE CLASSIC COLLECTION · 1904
"Plank Frame Barn Construction" by John L. Shawver is a practical guide on barn building techniques, written in the early 20th century. The book notably discusses the plank frame method, which has gained popularity, especially in the Central West of the United States. It aims to provide builders and farmers with detailed information on constructing efficient and durable barns while minimizing the use of timber and labor. In this informative book, Shawver shares insights from his extensive experience with plank frame barns, highlighting the advantages of this construction method. He discusses the significant savings in timber usage, reductions in costs associated with sawing and framing, and the overall efficiency in the building process. The text includes detailed descriptions of the design and assembly of various barn types, complete with illustrations and practical examples. Shawver addresses common concerns, offers expert advice, and presents case studies demonstrating the method's strength and durability, making it a resourceful guide for those interested in sustainable barn construction.
Introduction adapted from the source catalogue; source summaries may be automatically generated.
Free to read · English · 5,346 words · No account needed
MAKE TIME FOR A GOOD BOOK
On by default. Untick to stop anonymous reading totals. Each page counts after 10 seconds in view. How this works.
Anonymous counting is on unless you have switched it off.
The following is a bill of materials for a plank frame basement barn, 36 × 60 feet, basement 8 feet, with wall on one side, 16-foot superstructure, with a 23-foot bay at each end and a 14-foot driveway in the middle. Roof one-third pitch, plain gable, decks over driveway if permissible. Interior posts of basement to stand on stone pillars.
BILL OF MATERIALS.
Basement: First Bent.
Ins. Ins. Ft.
2 sills 2 × 8 × 60
(or six 2 × 8 × 20)
12 posts 2 × 8 × 8 4 door posts 2 × 6 × 8 6 post fillers 2 × 8 × 8 4 nailers 2 × 6 × 12 1 nailer 2 × 6 × 14 3 joist bearers 2 × 10 × 60 (may use 14s and 24s.)
10 braces 2 × 6 × 10 Bents 2, 3 and 4 similar.
12 posts 2 × 8 × 8 18 post fillers 2 × 8 × 8 20 braces 2 × 4 × 6 3 joist bearers 2 × 10 × 60 Ends of Basement.
8 sills 2 × 8 × 9 (or four 2 × 8 × 18)
4 nailers 2 × 6 × 18 (or eight 2 × 8 × 9)
4 nailers 2 × 8 × 18 16 braces 2 × 6 × 10 56 braces 2 × 4 × 6 28 brace blocks 2 × 4 × 16 Superstructure: Two End Bents.
4 sills 2 × 8 × 36 (or eight 2 × 8 × 18)
12 nailers 2 × 6 × 18 4 beams 2 × 8 × 36 (or eight 2 × 8 × 18)
20 posts 2 × 8 × 16 10 post fillers 2 × 4 × 16 8 braces 2 × 6 × 18 8 purlin posts 2 × 8 × 8 8 braces 2 × 4 × 9 2 gable ties 2 × 6 × 18 6 stiffeners 3 × 6 × 16
Two Interior Bents.
4 sills 2 × 8 × 36 (or eight 2 × 8 × 18)
4 sills 2 × 8 × 2 8 posts 2 × 8 × 16 8 purlin posts 2 × 8 × 24 (or twelve 2 × 8 × 16)
4 roof supports 2 × 8 × 22 4 sub-supports 2 × 6 × 17 4 collar braces 2 × 12 × 5 8 stays 2 × 4 × 3 4 ties 2 × 8 × 8 4 ties 2 × 6 × 5 4 ties 2 × 6 × 4 4 braces 2 × 6 × 8
Two Floor Bents.
4 sills 2 × 8 × 36 (or eight 2 × 8 × 18)
4 sills 2 × 8 × 2 8 posts 2 × 8 × 16 8 purlin posts 2 × 8 × 24 4 roof supports 2 × 8 × 22 4 sub-supports 2 × 6 × 17 4 collar braces 2 × 12 × 5 8 stays 2 × 4 × 3 4 ties 2 × 8 × 8 4 ties 2 × 6 × 5 4 ties 2 × 6 × 4 4 braces 2 × 6 × 9 8 joist bearers 2 × 8 × 8
Side Timbers.
4 sills 2 × 8 × 23 2 sills 2 × 8 × 14 24 nailers 2 × 6 × 12 4 nailers 2 × 8 × 14 8 plates 2 × 8 × 23 4 plates 2 × 8 × 14 8 purlins 2 × 8 × 23 4 purlins 2 × 8 × 14 8 couplings 2 × 8 × 8 4 couplings 2 × 8 × 4 4 braces 2 × 4 × 12 16 braces 2 × 4 × 7 8 deck joist 2 × 8 × 14
Floors, siding, roofing, doors, etc., will be the same as in other
barns of same dimensions.
Foreman, $2.50 per day, 3 days $7.50 Two journeymen, $2 per day, 3 days 6.00 Two apprentices, $1.25 per day, 3 days 3.75 ————— Total $17.25 Raising and inserting braces, 1 day 5.75 ————— Total $23.00
Cost of completing same as other barns of same dimensions and style of
finish.
A Plank Frame Applied to a Skating Rink.
From N. B., Sussex, N. B.—We want to erect an auditorium, 50 × 200, with 16-foot posts and 12-foot sheds at each side for offices, waiting rooms, saloon, etc. We want galleries all around and a large band stand at one end, suspended from the roof. The building is to be used for a skating rink in winter and for public meetings during the summer. Will the plank frame system described in Carpentry and Building be suitable for the frame?
Answer.—The above inquiry was submitted to Mr. Shawver, who contributed the recent articles on plank frame construction, and in reply he says:
Your reading position is saved on this browser. Take it to another device with a library code. Reading pages adapt to text, rather than matching a printed edition.
BEHIND THE BOOK
This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Read the source licence.
The original source file, including credits and licence, is retained by this library. Request an original-format copy at no charge. Please include the book title and Project Gutenberg identifier #65399.
KEEP YOUR CURIOSITY GOING

Charles G. (Charles Griffith) Ross
Hannah Webster Foster

Emily Lawless
Edwin Hamlin Carr

Charles De Lano Hine
Andrew Ure