An outlaw’s diary: the Commune
Cécile Tormay

THE CLASSIC COLLECTION · 1862
"Chronicles of London Bridge" by an Antiquary is a historical account likely written in the early 19th century. The work aims to delve into the rich history of London Bridge, tracing its significance and alterations over the centuries. The narrative invites readers to explore the bridge's tales through engaging commentary and historical references. The opening of the book sets a reflective tone as the narrator, identified as Geoffrey Barbican, expresses nostalgia for the diminishing historical landmarks of London. He laments the ongoing changes in the city that threaten to erase traces of its past. This sentiment catalyzes a meeting with Mr. Barnaby Postern, who possesses valuable recollections about the earlier days of London Bridge. Their conversation heavily intertwines history with personal anecdotes, suggesting that Postern may share intriguing stories encapsulating the bridge's significance, from essential architectural developments to its cultural role, thus promising to connect readers with a sense of historical continuity amidst modernity's relentless march.
Introduction adapted from the source catalogue; source summaries may be automatically generated.
Free to read · English · 173,531 words · No account needed
MAKE TIME FOR A GOOD BOOK
On by default. Untick to stop anonymous reading totals. Each page counts after 10 seconds in view. How this works.
Anonymous counting is on unless you have switched it off.
“The ‘Gazetteer’ for Monday, Dec. 28th, 1767, informs us that the two Arches adjoining the South end of the Bridge were, at length, then stopped up, and wheels preparing to be erected in each of them; and on the 30th, most of the Locks at that part of the edifice were entirely closed by the ice. It was not, however, until the year 1770, as we are informed in Concannen’s ‘History of Southwark,’ page 233, that the Borough Water-works were perfected by the erection of a Steam-Engine; though a part of the machinery was originally erected on the River-banks for the supply of Mr. Thrale’s Brewery, when it was worked by horses. These works were then known by the name of their proprietor, which was afterwards changed for that of the Company which bought them: and an engine erected, wherein the pressure of the atmosphere acted upon the Steam-piston.
“I proceed now, Mr. Barbican, to give you some account of the Water-works erected at the North end of London Bridge, which were considered to be far superior even to the celebrated hydraulics of Marli, in France. You are already aware, that the wheels beneath the Arches were turned by the common tide-water of the Thames; the axle-trees being 19 feet in length, and 3 in diameter, having 4 sets of arms, 8 in each place, on which were fixed 4 rings, or fellies, 20 feet in diameter, with 26 floats of 14 feet long, and 18 inches deep. The gudgeons, or centre-pins, of these wheels, rested upon brasses, fixed on 2 large levers 16 feet long, the tops of which were formed of arched timber, the levers being made circular on their lower sides to an arch, and kept in their places by 2 arching studs fixed in a stock, through 2 mortices in the lever. To the lower part of the arch on the lever, was fixed a strong triple chain, the links attached to circles of 1 foot in diameter, having notches or teeth, to take hold of the leaves of a cast-iron pinion, 10 inches in diameter, with 8 teeth in it, moving on an axis. The other end of this chain had a large weight hanging from it, to assist in counterpoising the wheel, and to preserve the chain from sliding on the pinion. On the same axis with the pinion, were 2 cog-wheels; one of 6 feet in diameter having 48 cogs, and another of 51 cogs, each working in a trundle of 6 rounds: on this axis there was also a winch, by which one man could raise or lower the wheels as occasion might require. Near the end of the great axle-tree, was another cog-wheel of 8 feet in diameter, and 44 cogs, working into a trundle of 20 rounds, 4-1/2 feet in diameter; the axis of which was fixed in brasses at each end of the lever before mentioned, and communicated with iron cranks having 4 necks, each of which raised an iron spear attached to levers 24 feet in length. To the other ends were fastened iron rods and forcing-plugs, working in cast-iron cylinders 4-3/4 feet long, 7 inches in bore above, and 9 below, where the valves were. These cylinders were placed over a hollow trunk of cast-iron, with 4 valves in it, immediately beneath them; and as one end of the trunk was furnished with a sucking-pipe and grate going into the water, they were each filled alternately, and delivered their supplies through curved pipes into a second trunk, furnished with an iron pipe, through which the water was forced up to any height required. These were, however, only half the works; the whole of the mechanism being double to each wheel. The first wheel in the Arch next the City, worked 16 forcers; and in the third Arch were three wheels, one working 12, the second 8, and another 16 forcers. Their utmost power of raising water was estimated from four of the wheels, to be 2052 gallons per minute; 123,120 gallons--being equal to 1954 hogsheads--in an hour; or 46,896 hogsheads daily, to the height of 120 feet, including the waste, which might be considered as a fifth part of the whole. Every revolution of a wheel, made 2-1/2 strokes in every minute in all the forcers, the wheels turning 6 times in a minute at high-water, and 4-1/2 times at middle water; and it was stated before a Committee of the House of Commons, that in the year 1820, these Works supplied 26,322,705 hogsheads of water. It is usual to give Dr. Desaguliers as the authority for these particulars, but I have abstracted them from the ‘Philosophical Transactions,’ already referred to; and they are also printed in Maitland’s ‘History,’ volume i., page 51, whence they have been copied into almost every subsequent account of London. After the grant of a fifth Arch to the Water-works, about July 1767, an improved wheel was designed by Mr. Smeaton, to be erected at that part; of which two engravings and several particulars, together with his remarks on the Water-engine, are inserted in the Second volume of his ‘Reports’ already cited, Plates ii.-iii., pages 27-30.
Your reading position is saved on this browser. Take it to another device with a library code. Reading pages adapt to text, rather than matching a printed edition.
BEHIND THE BOOK
This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Read the source licence.
The original source file, including credits and licence, is retained by this library. Request an original-format copy at no charge. Please include the book title and Project Gutenberg identifier #47475.
KEEP YOUR CURIOSITY GOING
Cécile Tormay

Moritz Busch
John L. Ransom
Frances Wright
Cécile Tormay

Mabel Potter Daggett