An outlaw’s diary: the Commune
Cécile Tormay
THE CLASSIC COLLECTION · 1902
"Ancient and Modern Engineering and the Isthmian Canal" by William H. Burr is a historical and technical account written in the early 20th century. The book concentrates on the evolution of civil engineering from ancient times through to the modern era, with a particular emphasis on major infrastructural works such as bridges, water supply systems, and, notably, the development and evaluation of potential routes for a canal across the Isthmus of Panama and Nicaragua. Aimed at both professional engineers and informed lay readers, it traces humanity’s engineering feats and explores the enduring relationship between civil development and technological progress. The opening of the book lays out its origins as a series of lectures and introduces its thorough organization, including a detailed table of contents. Burr’s introduction highlights the careful selection of illustrations and the decision to expand his public lectures for publication. The first chapters begin with an exploration of civil engineering’s ancient roots, dispelling the notion that the discipline is a purely modern invention. Burr meticulously describes early engineering achievements in Chaldea and Egypt, such as vast hydraulic canal systems, advanced brick and stone construction, and large-scale public works like dams, pyramids, and city defenses. The narrative emphasizes the importance of these feats for commerce, agriculture, and defense, and it transitions to Roman innovations—roads, building materials, sewers, and bridges—demonstrating both the continuity and advancement of civil engineering methods from prehistory into recorded history.
Introduction adapted from the source catalogue; source summaries may be automatically generated.
Free to read · English · 138,357 words · No account needed
MAKE TIME FOR A GOOD BOOK
On by default. Untick to stop anonymous reading totals. Each page counts after 10 seconds in view. How this works.
Anonymous counting is on unless you have switched it off.
=348. Itemized Statement of Length and Cost.=—The following table gives the lengths of the various portions of the canal and the principal items of its cost, so arranged as to show the classification of the various items of the total sum to be expended for all purposes during the construction of the entire work.
The commission estimated the total time required in preparing for and performing the actual construction of the work at eight years, but the writer believes that at least two years more should be allowed for the work.
------------------------------------------------+------+------------ |Miles.| Cost. ------------------------------------------------+------+------------ Greytown harbor and entrance | 2.15| $2,198,860 Section from Greytown harbor to lock No. 1, | | including approach-wall to lock | 7.44| 4,899,887 Diversion of Lower San Juan | | 40,100 Diversion of San Juanillo | | 116,760 Lock No. 1, including excavation | .20| 5,719,689 Section from lock No. 1 to lock No. 2, including| | approach-walls, embankments, and wasteway | 10.96| 6,296,632 Lock No. 2, including excavation | .20| 4,050,270 Section from lock No. 2 to lock No. 3, including| | approach-walls, embankments, and wasteway | 16.75| 19,330,654 Lock No. 3, including excavation | .20| 3,832,745 Section from lock No. 3 to lock No. 4, including| | approach-walls, embankments, and wasteway | 2.77| 4,310,580 Lock No. 4, including excavation | .20| 5,655,871 Section from lock No. 4 to San Juan River, | | including approach-wall and embankments | 5.30| 8,579,431 Conchuda dam, including sluices and machinery | | 4,017,650 Auxiliary wasteway, including sluices, | | machinery, and approach-channels | | 2,045,322 San Juan River section | 49.64| 23,155,670 Lake Nicaragua section | 70.51| 7,877,611 Lake Nicaragua to lock No. 5, including | | approach-wall to lock and receiving-basins for| | the Rio Grande and Chocolata | 9.09| 19,566,575 Diversion of the Las Lajas | | 199,382 Lock No. 5, including excavation | .20| 4,913,512 Dam near Buen Retiro | | 125,591 Section from lock No. 5 to lock No. 6, including| | approach-walls and wasteway | 2.04| 3,259,283 Lock No. 6, including excavation | .20| 4,368,667 Section from lock No. 6 to lock No. 7, including| | approach-walls, embankments, and wasteway | 1.83| 2,309,710 Diversion of Rio Grande | | 176,180 Lock No. 7, including excavation | .20| 4,709,502 Section from lock No. 7 to lock No. 8, including| | approach-walls, embankments, and wasteway | 2.43| 1,787,496 Diversion of Rio Grande | | 117,580 Lock No. 8, including excavation | .20| 4,920,899 Section from lock No. 8 to Brito harbor, | | including approach-wall | .23| 553,476 Brito harbor and entrance, including jetty | .92| 1,509,470 Railroad, including branch line to Conchuda | | dam site, at $75,000 per mile | | 7,575,000 Engineering, police, sanitation, and general | | contingencies, 20 per cent. | | 1,644,010 +------+------------ Aggregate |183.66|$189,864,062 ------------------------------------------------+------+------------
Your reading position is saved on this browser. Take it to another device with a library code. Reading pages adapt to text, rather than matching a printed edition.
BEHIND THE BOOK
This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Read the source licence.
The original source file, including credits and licence, is retained by this library. Request an original-format copy at no charge. Please include the book title and Project Gutenberg identifier #75910.
KEEP YOUR CURIOSITY GOING
Cécile Tormay

Moritz Busch
John L. Ransom
Frances Wright
Cécile Tormay

Mabel Potter Daggett