An outlaw’s diary: the Commune
Cécile Tormay
THE CLASSIC COLLECTION · 1902
"Ancient and Modern Engineering and the Isthmian Canal" by William H. Burr is a historical and technical account written in the early 20th century. The book concentrates on the evolution of civil engineering from ancient times through to the modern era, with a particular emphasis on major infrastructural works such as bridges, water supply systems, and, notably, the development and evaluation of potential routes for a canal across the Isthmus of Panama and Nicaragua. Aimed at both professional engineers and informed lay readers, it traces humanity’s engineering feats and explores the enduring relationship between civil development and technological progress. The opening of the book lays out its origins as a series of lectures and introduces its thorough organization, including a detailed table of contents. Burr’s introduction highlights the careful selection of illustrations and the decision to expand his public lectures for publication. The first chapters begin with an exploration of civil engineering’s ancient roots, dispelling the notion that the discipline is a purely modern invention. Burr meticulously describes early engineering achievements in Chaldea and Egypt, such as vast hydraulic canal systems, advanced brick and stone construction, and large-scale public works like dams, pyramids, and city defenses. The narrative emphasizes the importance of these feats for commerce, agriculture, and defense, and it transitions to Roman innovations—roads, building materials, sewers, and bridges—demonstrating both the continuity and advancement of civil engineering methods from prehistory into recorded history.
Introduction adapted from the source catalogue; source summaries may be automatically generated.
Free to read · English · 138,357 words · No account needed
MAKE TIME FOR A GOOD BOOK
On by default. Untick to stop anonymous reading totals. Each page counts after 10 seconds in view. How this works.
Anonymous counting is on unless you have switched it off.
=336. Classification and Estimate of Quantities.=—The following table is arranged to exhibit a few only of the principal items of excavation, so as to give an approximate idea at least of the magnitude of the work to be done:
Dredging 130,920,905 cu. yds. Dry earth 47,440,316 ” Soft rock 14,029,170 ” Hard rock 24,151,214 ” Rock under water 2,780,040 ” Embankment and back-filling 8,389,960 ” Clearing 6,831 acres. Stone-pitching 250,089 sq. yds. Concrete, excluding retaining-walls 3,400,840 cu. yds. Concrete in retaining-walls 424,321 ” Cut-stone 22,272 ” Steel and iron, excluding cast-iron culvert lining 61,735,230 lbs. Cast-iron culvert lining 19,286,000 ” Brick culvert lining 34,542 cu. yds. Cost of lock machinery $1,600,000 Excavation in coffer-dam 9,907 cu. yds. Pneumatic work 145,557 ” Piling 415,600 lin. ft. Rock fill in jetties 451,500 cu. yds. Clay puddle, bottom and side 936,800 ”
=337. Classification and Unit Prices.=—The classification of the material to be excavated, both on the Nicaragua and Panama routes, was one to which the commission gave very thoughtful study no less than to the prices to be used in making the estimates. The following table, taken from pages 67 and 68 of the commission’s report, exhibits the classification and the prices adopted by the commission for purposes of its estimates:
Removal of hard rock, per cu. yd. $1.15 Removal of soft rock, per cu. yd. .80 Removal of earth, not handled by dredge, per cu. yd. .45 Removal of dredgable material, per cu. yd. .20 Removal of rock, under water, per cu. yd. 4.75 Embankments and back-filling, per cu. yd. .60 Rock in jetty construction, per cu. yd. 2.50 Stone-pitching, including necessary backing, per sq. yd. 2.00 Clearing and grubbing in swamp sections of Nicaragua, per acre 200.00 Other clearing and grubbing on both routes, per acre 100.00 Concrete, in place, per cu. yd. 8.00 Finished granite, per cu. yd. 60.00 Brick in culvert lining, per cu. yd. 15.00 All metal in locks, exclusive of machinery and culvert linings, per lb. .075 All metal in sluices, per lb. .075 Cast-iron in culvert lining, per lb. .04 Allowance for each lock-chamber for operating machinery 50,000.00 Additional allowance for each group of locks for power-plant 100,000.00 Price of timber in locks, per M B. M 100.00 Sheet-piling in spillways, per M B. M 75.00 Bearing piles in spillways, per lin. ft. .50 Average price of pneumatic work for the Bohio dam, below elevation—30, per cu. yd. 29.50 Caisson work for the Conchuda dam, in place, per cu. yd. 20.00 Single-track railroad complete with switches, stations, and rolling stock, per mile of main line 75,000.00
There are evidently other more or less uncertain expenditures, depending upon all possible conditions affecting the cost of such work, including those of climate, police, and sanitation. In order to cover such expenditure the commission determined to add 20 per cent to all its estimates of cost on both routes, and that percentage was so added in all cases.
Your reading position is saved on this browser. Take it to another device with a library code. Reading pages adapt to text, rather than matching a printed edition.
BEHIND THE BOOK
This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Read the source licence.
The original source file, including credits and licence, is retained by this library. Request an original-format copy at no charge. Please include the book title and Project Gutenberg identifier #75910.
KEEP YOUR CURIOSITY GOING
Cécile Tormay

Moritz Busch
John L. Ransom
Frances Wright
Cécile Tormay

Mabel Potter Daggett